So the simple drywall repair and paint that turned into a mostly everything remodel of the Master Bath is nearly complete. Walls and ceiling are painted, Skylight and blinds are 99% done, just a few adjustments to make to the mechanism and some sanding/waxing of the track I made. Then it’s pretty much paint and attach the trim and put the toilet back in. Oh, and the new vanity and sink. which means fixing the pipes from the walls so that we can actually use the vanity and sink since they did something totally strange for the old one. So so long as we remember to NOT run the dishwasher when we get home so that I can shut the water off, I should be able to finish up the plumbing tonight.