Drywall mudding is much improved. I had forgotten to whip the mud before using it. I should be able to spray texture tomorrow. I got the server up and running. I’m not sure how long it’ll be running. On one hand, I don’t want to shut it off because of leaking capacitors. It takes a while for them to build up a charge so that it stays booted up. On the other hand, heat and electricity are part of the problem of the leaking capacitors. Catch-a twentee too.
Temp wise I’m not too concerned, the processor hasn’t got much over 32C, The heatsink is big enough that it’ll probably run with out the fan.
Went shopping today. Hit Home Depot, Fred Meyer, Subway, Wal*Mart, and the video store.
Rented Aeon Flux. Very interesting. I only saw bits of a few of the animated. Perhaps I’ll have to check out the series when time allows. Time being the key. All in all a unusually productive non-productive day.