The kitchen is done. For the most part. Sub-floor is repaired and new tiles are down. The soffits and walls are now painted; finally. The trim for the kitchen is up sort of. Just need the nail holes filled and corners caulked. We used black rubber cheap molding for around the cabinets. The same stuff around our bathrooms walls that I hate (different colour). I think it came out better then it would have with wood molding. The matte black disappears. I was going to post pictures but now it seems that My computer has decided to take a crap. Though I probably could reach under the desk and hook the card reader up to the server.
…
Well, not only has my computer decided to take a crap, I say it’s taking a crap and not going to shit for a couple of reasons. One is I am trying to watch my language believe it or not. The other is so far it seems to just be the boot loader that is having trouble which may simply mean that the spare drive that I was playing with had died. It is not unexpected. Now, if it turns out that something else is also wrong, and I need to get some new hardware, then I will say that the computer has got to shit. At this point and time, it is just indisposed until I can get home after work one day and apply a binary laxative and fix the GRUB loader but it seems that the front port for my computer is only USB 1.1. The rear port on the ‘old’ server is only USB 1.1 and it transferred the files just as fast as my computer ever did. Yum, another project.
…
After fiddling with GIMP, learning a new program before getting ready for work is NOT a good idea, here are some photos.
OK, off to get ready for work. and screw the spelling.