After 3 trips to Home Depot…
Finish the gravel
Lay out the Styrofoam wall.
1/2 done :-)
Lay out the new vapor barrier
it’s 3/4 done :-) :-)
Make the pump mount more permanent.
first attempt failed.
Build a platform to go over the sum and pump.
Possibly dig a trench from way up in front of the garage to the sump.
still need to fish the last of the crap out from under the garage.
Throw the last of the crap out that was under the garage.
will have to wait until Friday trash day
finish resealing and insulating the ductwork.
Run a new power line to the sump pump that isn’t on the same circuit as the living room.