Almost Done?

Finish the gravel
Lay out the new vapor barrier
(it’s only half done. Kind of)
Make the pump mount more permanent.
Build a platform to go over the sum and pump.
Possibly dig a trench from way up in front of the garage to the sump.
a still need to fish the last of the crap out from under the garage.
finish resealing and insulating the ductwork.

6mil plastic is pretty tough. I don’t think I would be able to break it with a crayon.
I wish the sheet was 27*30 instead of 20*100. I would have been able to do it in one sheet. Then again, I still haven’t decided if we should do under the garage.

Have to take the night off from the crawl space. Need to help clean the house. There are still tools from the drywalling out. With any luck we don’t have an emergency while trying to clean which has been the case thus far this year.

2 thoughts on “Almost Done?”

    • Hoping none crop up over the next few days.
      Cap’n Jack will be returning to AK for a few days to do his set foot on Alaskan soil thing for residency. It would be nice to be able to visit instead of having to do disaster management. :-)
      Not to mention, Im’s tarred, I need the break!

Comments are closed.